Lakeshore East: Service Adjustment April 12- 13
Lakeshore East: Service Adjustment April 12- 13
- The Future and GO
- Construction Notice
- Lakeshore East: Service Adjustment April 12- 13
On Saturday, April 12 and Sunday, April 13, GO trains will run every 30 minutes between Durham College Oshawa and Danforth GO. There will be no GO Transit service between Danforth GO and Union Station. Some late-night service will also be adjusted on Friday, April 11.
If you’re travelling to Union Station from Danforth GO, please consider the following TTC option:
- Proceed to TTC Line 2 (Main Street Station), west. Transfer to TTC Line 1 at Yonge/Bloor station travelling south to Union Station.
If you’re travelling to Danforth GO from Union Station, please consider the following TTC option:
- Take TTC Line 1 northbound to Yonge/Bloor station. Transfer to TTC Line 2 travelling eastbound to Main Street station.
Check schedules before you travel.
Do not forget to tap off on a PRESTO device when you get off the train if you do not have a default set to your card.
Connecting between GO and TTC?
Save with One Fare. One Fare applies when you pay your fare with a physical PRESTO card, PRESTO in Mobile Wallet, or with a contactless credit or debit card. It does not apply for cash fare or ticket products. You must use the same card throughout your entire trip.
What type of construction work is happening?
Over the next 10 years, Metrolinx is transforming the existing GO rail system to deliver a whole new rapid transit experience to your community. The east section of Union Station Rail Corridor (USRC) is continuing its track integration work for the Ontario Line. The Ontario line will make it faster and easier to travel within Toronto and beyond. This will add 15 stops and more than 40 connections to other transit, including GO train, subway, LRT, streetcar and bus routes. It will take less than 30 minutes from one end of the line to the other and result in 28,000 fewer car trips on the road each day.